Skip to content

Thruway Toll increase opposed by many

Posted by WCS Permits on June 2, 2012

The New York State Thruway Authority proposed a toll rate increase of 45% for all commercial trucks, including oversize and/or overweight loads. NY Thruway toll increase proposed, which could affect oversize loads

Commercial truckers and business owners are opposing the proposed hike, as are New York local and state politicians.

NY State Assemblyman, John Ceretto says the hike may push truckers away.

The proposed increase is still in talks, and the Thruway Authority plans to hold hearings to discuss. At this point, there is no timeline as to when the increase would come into play if it was passed.

Commercial truck drivers and business owners are expected to share their concerns at these public hearings.

Facebook Twitter Linkedin

Comments

There are no comments on this entry.

Trackbacks

There are no trackbacks on this entry.

Add a Comment

Required

Required

Optional

Latest Industry News

Memorial Day Travel Restrictions

May 15th, 2013

WCS Permits published travel restrictions and DOT office closures for Memorial Day and Memorial Day weekend. On Monday, May 27 all DOT offices in the 48 continental states will be closed for business. WCS Permits' east...READ MORE...

MD raises survey standard

April 12th, 2013

Effective immediately, Maryland State Highway Administration's Hauling Permits Section is requiring height surveys for a new standard. Loads 14'6" and higher will need a height survey. For I695, loads 15'6" or higher require the survey. MD requires each...READ MORE...

MD allows night moves

April 5th, 2013

Effective now, the state of Maryland department of transportation will allow overnight travel (9 p.m. to 5 a.m.) for permitted loads within certain dimensions. Permitted loads not exceeding 75-feet long, 14-feet 6-inches high, 12-feet wide...READ MORE...

WCS News

Empty reactor superload moved from CA to AZ

May 7th, 2013

WCS Permits worked with heavy haul transportation company, Emmert International to move a 502,000-pound empty reactor last weekend. The 19-10 high, 18-foot wide and 200-foot long superload started in Oxnard, CA and made it successfully...READ MORE...

Stator Rotor successfully moved off freeway

March 19th, 2013

The stator rotor which was being transported during a crash on the 22 and 405-freeway connector was finally removed from the freeway. The accident, which occured last Friday, March 15, restulted in immediate closures on...READ MORE...

WCS launches Permit Attachment App

February 26th, 2013

WCS Permits has released its Permit Attachment App. The mobile application was officially released last week, but after updates, the version 1.2 update is anticipated this week by both iOS and Android. The Permit Attachment App...READ MORE...

Switch to our mobile site